NOTICE – LAKE FREDERIC/YORK HAVEN STATION PLANNED LAKE DRAWDOWN STARTING ON TUESDAY, SEPTEMBER 3, 2024
On Tuesday, September 3, 2024, York Haven Power Company (YHPC) plans to slowly lower Lake Frederic, the reservoir upstream of the York Haven main dam, for maintenance required by the Federal Energy Regulatory Commission (FERC). Lake Frederic will be lowered for up to 6 weeks (weather dependent). Boaters should use caution on Lake Frederic due to low water levels. Some of the access ramps may not be suitable for use by larger vessels. Water levels are expected to go below 277 ft elevation by about 14 inches. Required minimum flows at the main dam will be maintained.
Please send questions or requests to be added to our Notification List for updates to yorkhaven@eaglecreekre.com.